Finish the Minex project: complete AutoDesign solids and run SchedOpt.

About this feature

Part 2 continues the Minex project through AutoDesign solid creation and into SchedOpt. You finalise pit/dump solids, import them with roads, configure destinations and periods, then run the schedule.

Use the same project file from Part 1 so model and design stay linked.

Step by step

  1. Open the project saved at the end of Part 1.
  2. In AutoDesign, finish pit/dump design edits.
  3. Create and populate solid blocks.
  4. In SchedOpt, import pit blocks, dump blocks and roads.
  5. Set plant/stockpile, periods, capacities and priorities.
  6. Run the schedule, review results, and save.