End-to-end project: block model workflow
Walk through a full MineOpt project built around a regular block model — from import to schedule-ready solids.
About this feature
This longer project-style tutorial ties the modules together for a conventional block model: load the model in PitOpt, generate shells, design the pit and dump in AutoDesign, create solids, then bring everything into SchedOpt.
Follow the same project file from start to finish so links between modules stay intact.
Step by step
- Create a new project and import the regular block model in PitOpt.
- Set rock types, slopes and economics; run pit optimisation.
- Import a chosen shell into AutoDesign and refine the pit design.
- Create pit and dump solids and populate attributes.
- Import blocks and roads into SchedOpt; set periods and capacities.
- Run a schedule, review results, and save the completed project.