End-to-end Minex project (Part 1)

ProjectBeginner 35 min 1 views

Start a full Minex-based project: import the Minex model in PitOpt and prepare AutoDesign.

About this feature

Part 1 of the Minex project series focuses on getting a Minex model into PitOpt, checking structure/quality/topography inputs, running an initial optimisation, and handing a shell into AutoDesign.

Complete Part 1 before Part 2 so SchedOpt receives consistent solids.

Step by step

  1. Create a new project dedicated to the Minex case.
  2. In PitOpt, import the Minex model (*.B35 and related files).
  3. Check topography, weathering, rock types and grades.
  4. Set slopes and economics; generate pit shells.
  5. Move to AutoDesign and import the selected shell.
  6. Save the project — continue with Part 2 for scheduling.