End-to-end Minex project (Part 1)
Start a full Minex-based project: import the Minex model in PitOpt and prepare AutoDesign.
About this feature
Part 1 of the Minex project series focuses on getting a Minex model into PitOpt, checking structure/quality/topography inputs, running an initial optimisation, and handing a shell into AutoDesign.
Complete Part 1 before Part 2 so SchedOpt receives consistent solids.
Step by step
- Create a new project dedicated to the Minex case.
- In PitOpt, import the Minex model (
*.B35and related files). - Check topography, weathering, rock types and grades.
- Set slopes and economics; generate pit shells.
- Move to AutoDesign and import the selected shell.
- Save the project — continue with Part 2 for scheduling.